# Work performed Description
1 BLRT quay no. 6 and no. 7

Electrical panels for shore power and for unloading equipment embedded beneath the surface of the quay. GE’s UC Series of circuit breakers was used. The solution ensures an unobstructed manoeuvring area throughout the quay, while immunising the risk of damage to electrical panels.

2 LED lighting for new practice courts at Kääriku sports complex

A total of 15 sets of 15 m high masts and AAA-LUX LED WS1002 sports field spotlights were used for illuminating tennis court and multi-courts. The whole system can be separately controlled and dimmed for all individual courts, both from the display in the control room and via basic smartphone.